Layer 1 · Execute
LuxiEdge
Deterministic, efficient GPU math. Up to 16 to 50% less GPU energy per token than vLLM batch-invariant mode, and 14 to 19% less on prompts than SGLang deterministic mode, at 1.5 to 2.7x and 1.18 to 1.24x the speed.
Prefill on H100: 1.18x the tested vLLM throughput at batch 16 with about 12% lower GPU-board energy per position; under 1% run variation; about 44,860 positions/s at about 0.01532 J/position at batch 72.
Layer 2 · Shape
LuxiPhase
Schedules when AI work draws power so rack and hall power stop lunging. Same average work, calmer aggregate kW.
On 8x RTX PRO 6000 GPUs: about 9x lower aggregate power variance with about 5% throughput delta. 16 of 16 model gates pass. Complements UPS, batteries and power caps; not a battery replacement.
Layer 2 · Shape
LuxiPhase for co-located data centers
For AI load next to on-site generation: phase control of the AI load and a deterministic plant-side power schedule the generator can follow ahead of time.
16 of 16 gates pass; multi-GPU timing about 4.7% throughput delta.
Layer 3 · Schedule
LuxiPak
GPU cluster packer and placement layer. Packs multi-GPU jobs onto nodes, admits work only after dependencies are ready, scores idle waste in dollars, and sends placement recommendations to Slurm or Kubernetes.
Synthetic scale from 8 to 256 nodes; 21 of 21 gates green (v0.4.0).
Layer 4 · Coordinate · Roadmap
LuxiLoad
Matches compute demand to the site: power generation, electrical system, cooling and reliability limits.
Roadmap
LuxiSDG
Guarded local demand management for smaller commercial sites.